Plumbing & Sanitary Installations

Storage/ Inspection of Materials.

P.V.C pipes should be stacked on level grounds. Alternatively, supports should be provided at base at 1.5M centers stack should not be more than seven layers high. If pipes may be nested inside larger pipes.

Retain G.I coupling at the end of G.I till pipe is to be installed. Clean, Inspect and if necessary, Re-thread the factory threaded pipes prior to installation.

Ensure that pipes are straight (unbent) prior to installation on vertical stacks and suspended lines.

Do not lay P.V.C pipes exposed to sun and unprotected-before or after installation.

Inspect C.I pipes and fittings for cracks prior to installation. A clear ringing should be heard when mildly struck with a hammer.

Remove factory posted stickers/ paper from vitreous china sanitary ware and inspect for cracks prior to installation.